Adelaide Desalination Plant

Located at Lonsdale, approximately 26 km south of Adelaide, the $1.8b 100 GL desalination plant delivers up to 100 billion litres of water each year, half of Adelaide’s water supply. The desalination plant featured a staged construction with two identical 50 GL per year plants serviced by common intake and outfall systems, wastewater treatment and chemical and lime dosing chlorine facilities. The plant storage consists of two 25 ML tanks that transfers water to South Australia water’s Happy Valley reservoir site for interconnection to the Adelaide distribution system. The plant also comprised a transfer pumping station, transfer pipeline and a visitor centre.

We were responsible for the detailed design of all non-process components of the project. This was undertaken under two separate contractual agreements, one with McConnell Dowell and Abigroup Joint Venture (MAJV) for balance of works and one on schedule of rates with Acciona for the process works. Scope of works included all designs for the plant including architectural, civil, structural, building, geotechnical, marine, tunnels, earthworks, drainage, underground services, environmental and landscape design.


Country
Australia

Service
Architecture & Landscape, Engineering & Specialist Services

阿德莱德海水淡化厂

该海水淡化厂位于距阿德莱德南部约26公里的龙狮戴尔,这家总值1.8亿美元、容量达100GL海水淡化厂每年可以提供1000亿升的淡水,占据了阿德莱德一半的供水量。该海水淡化厂有两处装置,正在进行阶段施工,两处装置年产能均为50GL,配有普通的进排水系统,废水处理及化学和石灰投加氯设备。淡化厂蓄水区由两个25ML的储水池,可以将淡水输送到南澳大利亚的欢乐谷水库,以便和阿德莱德的配水系统相连接。该厂房还配有一个调水泵站、输送管路以及一个访客中心。

我们负责该项目所有非过程性组件的细节设计。就此我们签订了两份独立的合同协议,一个是同McConnell Dowell 和Abigroup合资公司(MAJV)签订的为了平衡工作的协议,一份是同Acciona签订的流程工作的协议。我们的工作范围包括:所有厂房的设计工作,涵盖建筑、土木、结构、建造、土工、海洋、隧道、土方、管道、地下设施、环境和景观设计。


Country
澳大利亚

Service
建筑与景观, 工程及特殊服务