Ulu Jelai Hydroelectric Project

Located on the Bertam River in the Cameron Highlands of West Malaysia, the 372 MW Ulu Jelai Hydroelectric Project (HEP), once commissioned, will contribute 326 GWh of peak energy annually to Malaysia’s power supply system.

The main features of the development are:

  • The 84 m high Roller-Compacted Concrete (RCC) Susu Dam with 1.3 million cubic metre embankment volume incorporating a 100 m wide ungated spillway and 2 deep sluice gates for the excavation of sediment.
  • Diversion weirs on the Telom and Lemoi rivers for the transfer of water to Susu Dam
  • 20 m high intake tower with 8 intake orifices and 4 gated conduits
  • Telanok Underground Power Station housing 2 vertical Francis turbo-generators of 186 MW capacity
  • 22 km of tunnels

We completed the tender and detail design of the project and is currently providing construction supervision and project management services for the project.

Our scope of work includes:

  • Detail design of civil works
  • Review and approval of electrical and mechanical plant and equipment
  • Contract management and construction supervision
  • Quality control
  • Witnessing of factory testing of main plant
  • Supervision of plant installation
  • Claim management
  • Commissioning

In September 2015, the final cubic mete of Roller Compacted Concrete (RCC) was placed in the 84 m high Susu Dam of the Ulu Jelai Hydroelectric Project (HEP) in Malaysia.

326 GWh of
peak energy annually


Country
Malaysia

Service
Quantity Surveying & Cost Management, Construction Management, Engineering & Specialist Services

乌鲁泽来水电站项目

装机容量372 MW的乌鲁泽来水电站项目位于马来西亚西部金马仑高原的Bertam河上,投运后将每年向马来西亚的供电系统提供峰值326 GWh的电能。

“该项目的主要特征如下:

  • 84米高碾压混凝土(RCC)Susu大坝,130万立方米坝堤,100米宽无闸泄洪道,2道深水闸门用于淤泥开挖。
  • Telom河和Lemoi河上的分水堰,用于将水分流到Susu大坝
  • 20米高的进水塔,带8个进水口和4条配备闸门管道
  • Telanok地下发电站,配备2台186 MW的Francis涡轮发电机
  • 22 公里长的隧道

我们完成了该项目的投标和详细设计,目前正提供该项目的施工监督和项目管理服务。

我们的工作范围包括:

  • 土木工程详细设计
  • 机电装置和设备审查和批准
  • 合理管理和施工监督
  • 质量控制
  • 见证主要装置的工厂试验
  • 装置安装监督
  • 索赔管理
  • 试运行

2015年9月,马来西亚乌鲁泽来水电站84米高Susu大坝的碾压混凝土(RCC)浇筑全部完成。”

326 GWh
每年峰值发电量


Country
马来西亚

Service
数量测量与成本管理, 建筑工程管理, 工程及特殊服务