Tuas Terminal Phase 1

The Tuas Terminal Phase 1 will serve as one of the future container port terminals which will cater for the relocation of the current City Terminals (Tanjong Pagar, Brani and Keppel Terminals) and Pasir Panjang Terminal.

The planned relocation of the City Terminals and Pasir Panjang Terminal to Tuas will free up 325 and 600 hectares of waterfront land respectively and present huge redevelopment opportunities.

As key pillar in Singapore’s Next Generation Container Port, the Tuas Terminal is an engineering feat with many innovative features. For instance, the design includes the re-use of dredged and excavated materials as reclamation fill materials which results in significant material cost savings of some $1 billion. The use of innovative caisson design for the wharf structures also helps to improve productivity and quality as the caissons are of standard sizes and pre-fabricated in a controlled environment on site.

Surbana Jurong is the appointed consultant for the planning and engineering design as well as the supervision of the construction, which includes project management, contract administration and site supervision for this mega project.

Re-use of dredged and excavated materials as reclamation fill materials
results in cost savings of about $1 billion


Country
Singapore

Service
Engineering & Specialist Services, Project Management, Construction Management