Raffles Hospital

Surbana Jurong secured this project to add an extension to the existing Raffles Hospital.

The extension includes an increase of its gross floor area from 29,000 to 50,000 square metres and an enhancement of 30% existing floor area for Raffles Hospital. One key challenge faced by the structural team was in designing and building two levels of basements which lie within the MRT’s (Mass Rapid Transit) 2nd Reserve Zone.

SMM, a member of the Surbana Jurong Group, has also provided asset integrity management services for Raffles Hospital to ensure that all aspects of operations are functioning effectively and efficiently.

50,000 square metres
gross floor area


Country
Singapore

Service
Engineering & Specialist Services, Construction Management, Facilities Management

来福士医院

该项目为现有的来福士医院进行扩建。

扩建内容包括将总建筑面积从29000平方米增加至50000平方米,并对30%的现有建筑面积进行加固。结构团队面临的主要挑战是在地铁站第二预留区内设计和修建两层地下室。

总建筑面积
50,000平方米


Country
新加坡

Service
工程及特殊服务, 建筑工程管理